Español

ATBL MINING S.A. DE C.V.

We are a sustainable mining company, driven by solutions and attached to the protection of the natural environment, making us one of a kind.

VISION : To work harmoniously with our entire work team, inculcating and promoting an ecological culture with environmental technological efficiency, which allow us to grow together towards the achievement of our objectives.

MISSION : To be a 100% ecological mining company in the extraction of precious metals, with the lowest production costs in the world due to its optimal processes, which will guarantee a rapid return on investment to its shareholders as well as generate economic spillover and development, favoring communities in a sustainable way through the creation of jobs.

Project 1

Soyopa

Locationarrow_downward

Project 1 Soyopa is within a highly gold-bearing area of ​​the Yaqui River, it is located in the municipality of Soyopa, Sonora. Access to it is by land, starting from the City of Hermosillo, Sonora by paved road of 154.6km to the municipality of Soyopa, and 5km of dirt road in good condition, reaching the project in just 1 hour 40 minutes. And it is made up of 2 mining concessions: Yaqui 2 and Yaqui 4, whose total extension is 299.79 hectares and has 2.8km of river bank from side to side, of which they are surrounded by 3 areas of high Geological-Mining interest.

The region is considered purely gold-bearing, and dates from the year 1540, and it was here that the largest gold rush in the State began when pleasures were discovered near Soyopa, rich in gold nuggets on the Yaqui River, motivating the mobilization of thousands of indigenous people from various tribes, reaching a concentration of up to three thousand Yaquis daily working at the site, so the exploitation lasted until the end of 1780.
Because the gold nuggets did not require any type of purification process, the Colonies of established miners were ephemeral, since they lasted only a few years in the extraction of gold.

The origins of these deposits were caused by the action of erosion by the wind and rain, the mountains of the old sierra had been reduced to almost half and some to their base, leaving a series of disaggregated rock masses in the form of hills. The gold from the quartz veins of the ancient mountains was deposited for thousands of years in the form of gold nuggets and dust. With regard to our mining lots, there is immense potential given that millions of tons of unprocessed, practically virgin material are preserved, of which is our intention to exploit with a technique called volume screening and washing, where the fine materials will be separated from the thick ones to recover by gravity. A wide sampling was carried out giving an average grade of 3.46gr/ton. It is important to note that NO type of chemical material will be used for the process such as mercury or cyanide, which are so damaging to the environment. For our reserves, a volumetric study was made in the first 75 hectares in one of the lots of project 1 Soyopa, and around 44 million tons of material were cubed in Alluvial Terraces, of which 1,414,790 Ounces of Gold were calculated, taking as a base one single gram per ton, which is equivalent to 43.59 tons of Gold in one third of the composition. All our work will be carried out through open-pit trenches, recovering the materials by the process already described allows us to extract them from the different layers established in the subsoil, as well as on the walls of the channel and the river bank, always maintaining the balance of the ecosystem, depositing in the same place of extraction the processed material that will be sown as fodder for livestock, transforming the unused lands into useful areas, thus complying with our policies of not harming the ecology and protect nature.
extension
Projects0
list_alt
Cubed Hectares0
grid_on
Total Hectares0
monetization_on
Cubed Ounces (Au)0

Our team

Executive


Guillermo Arce Sánchez

Managing director

Adolfo A. Hannig

Director of financial structuring

Geol. Fabián Johnston

Project and production manager

Ing. Marco García

Environmental department

Ing. Osiris Arce Olguín

Computer technologies department

LAE. Guillermo Valencia

Department of finance

Ing. Alberto Molina Reyes

Refining & Finishing Department

Lic. Chezzare Arce Olguín

Marketing director

Lic. Saul de León Espinoza

Legal department

Lic. Clio Sofía Arce Olguín

Director of International Marketing & Sales

Lic. Mauricio Tadeo Castro

Director of Purchasing and Supplies

Lic. Miguel Ángel Arce Olguín

Chief Accounting Officer


Team of service providers and suppliers


Lic. Gabriel Sánchez Valencia

Food services and industrial dinnings

C.P. Nicolas Jaime Estrada Bay

Legal advice and coordinated accounting services

Francisco David Amaya García

Hermosillo purified water distributions

C.P. José Alberto Molina Acedo

Specialized private security

Eduardo Figueroa Omelas

Hermosillo septic services

Ing. Gustavo Méndez S.

Screens and metal products

Ing. Victor Manuel Barrera Serrano

B4 Engineering, construction, automation and maintenance

84 Total Employees

21 Employees per shift
42 Employed between tho shifts
Shift change every 10 days


Contact

email

guillermo@atbl.com.mx

phone

+52 55 2057 7997

...
Gold price today

Gold price per ounce based on the New York market. (Updated every 8hrs).